Ayer Select Board Approves Contracts, Sets 2% COLA Amid School Budget Pressure

AYER — February 17, 2026 — Ayer Select Board approves $154,000 in public-works contracts and a 2 percent non-union cost-of-living raise as school budget remains the key unknown. The board voted unanimously Tuesday to award Duba Electrical Contracting of Harvard a $37,670 contract for wastewater pump station generator connections and to approve a $116,998.57 change order on the Rightway Sewer Pump Station upgrades project. Town Manager Robert Pontbriand reported that the town's Omnibus budget is now tracking below its 5 percent growth target after MIIA confirmed Ayer's health insurance rate increase at 6.2 percent — down from a placeholder as high as 25 percent in January — saving roughly $492,000 against earlier projections. The Ayer-Shirley Regional School District's proposed 11.9 percent assessment increase, representing about $1.8 million, remains the critical unresolved variable; Pontbriand warned that if the number does not come down before the March 17 statutory deadline, the town faces more than $1 million in additional cuts on top of reductions already made.

Keep reading with a 14-day free trial

Subscribe to The Ayer MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Ayer MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Bedford Post · The Belmont Post · The Billerica Post · The Boxborough Post · The Burlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.